Gürsu has seen rapid growth in both industrial investment and new housing, so most facade work here happens at the new-build stage alongside the structure.
Facades coordinated with the structure
Setting anchor positions before slabs are poured greatly reduces later drilling and cost — which is why we offer detailed design as early as possible.
Industrial buildings
We give production plants a corporate look by cladding over sandwich panels with composite or metal panels, and install thermally broken curtain walls on office blocks.
Our services in Gürsu
Questions about facade cladding in Gürsu
Are the site survey and quote free in Gürsu?
For projects in Gürsu, the on-site survey, measurements and preliminary quote are free. Once you fill in the form, our project manager will call you within 24 hours to schedule the survey.
Which facade systems do you install in Gürsu?
In Gürsu we provide the full range: curtain wall glazing, composite panel cladding, ventilated exterior cladding, thermally broken aluminium joinery and facade detail design.
How long does facade cladding take in Gürsu?
It depends on the facade area and the system. For an average residential or office building, detail design and fabrication take 2–4 weeks and installation 3–8 weeks; the exact schedule is shared with the quote.

